html Inspection and press tryout up to 1600 t | INNOTECH Skip to content
INNOTECH / FULL-CYCLE TOOLING
CNC 6200×3300EDM 14TRYOUT 1600 t
03 / QC + TRYOUT
Home—Inspection & Tryout
Validation before shipment

Geometry inspection and tryout up to 1600 t

We measure base geometry before tryout and validate die performance at our own manufacturing site.

0.002/300CMM accuracy
3DBlue Light Scanner
1600 tmax. press force
Quality inspection

Measurable parameters before the die goes on press

CMM and 3D scanning provide objective geometry verification before tryout and create a clearer basis for acceptance.

1500×1000×800CMM Hexagon
0.002/300CMM accuracy
3DBlue Light Scanner · ZG
CMM Hexagon INNOTECHQC / CMM / 3D
Measuring equipment

Geometry inspection

Coordinate measurement, 3D scanning and manual measuring tools.

TypeBrandParametersAccuracyYear
CMMHexagon1500×1000×8000.002/3002018
Blue Light 3D ScannerZG3D scanner0.002/3002022
Height GaugeGuanglu0–6000–6002018
Calipers / MicrometerGuangludigital / mechanical tools—2024
Tryout and tuning

Three presses for different tryout scenarios

Before shipment, geometry, material behavior, coil feeding and stroke stability can be verified.

PRESS RANGE
630 t1000 t1600 t
MECHANICAL / HYDRAULIC / MECHANICAL
YT2E-1600
MAX TRYOUT1600 t

YT2E-1600

12–25 strokes/mintable 5000×1800 mmshut height 1200 mm
YADON 630T
MECHANICAL630 t

YADON 630T

12–25 strokes/min · table 4000×1800 mm

YQK27-1000
HYDRAULIC1000 t

YQK27-1000

3–5 strokes/min · table 4500×2500 mm

INNOTECH coil feedingINNOTECH cranes
Feeding & logistics

Ready for full in-house tuning

Coil feeding, cranes and a forklift allow large tooling to be moved and tuned in-house without separate external logistics during tryout.

up to 6 t · 1600 mmQinglin QLNC6-1600H · 2025
7 tforklift
25 t + 15 tmaximum crane combination · 2025
Before shipment

What we validate on our manufacturing site

The more issues are resolved before delivery, the lower the risk of rework at the customer’s site.

01

Geometry

CMM, 3D scanning and dimensional inspection.

02

Die performance

Tryout, corrections and stroke-stability verification.

03

Material feeding

Verification of coil feeding and material behavior.

04

Acceptance package

Samples, reports and shipment preparation.

Next step

Need to evaluate a die for your conditions?

Send the part, material, annual volume and equipment requirements.